« Basement renovation, day 1 | Main | Concert: They Might Be Giants »

Renovations, day 2

A short day today. The concrete floor dried nicely, so we set to work filling in the holes in the concrete created when we ripped out nails from the moldings. The filler material comes in a squeeze bottle, but it's really hard to get the material out after a while. Despite that, we got all of them done in only a few hours. Then we have to let the filler dry before applying sealant to the entire floor tomorrow.

About

This page contains a single entry from the blog posted on November 28, 2009 2:26 PM.

The previous post in this blog was Basement renovation, day 1.

The next post in this blog is Concert: They Might Be Giants.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.31